Experience

Geophysical Engineering Intern

Terracon · Internship

St. Louis, Missouri

  • Independently completed field assignments across 15+ projects using Wenner-array electrical resistivity, MASW, magnetometry, GPR, private utility locating, Emlid positioning, and electromagnetic locating equipment.
  • Calibrated an L&R MiniRes resistivity meter; troubleshot MASW, resistivity, and magnetometry systems; maintained positioning, field notes, and pre-task quality and safety checks.
  • Processed MASW data in SurfSeis6 and prepared Excel-based reports for approximately 20 electrical-resistivity lines, organizing processed data and field summaries for review.
  • Led two-person crews, reviewed project scopes, assigned tasks, coordinated with project managers and onsite contractors, and revised ineffective survey layouts approximately 25 times.
  • Collected 100+ Wenner resistivity lines, four MASW lines, GPR data, approximately 15 acres of Magnetometry coverage, one private utility-clearance site, and 50+ positioning points.
  • Located and marked utilities and subsurface anomalies, including an unmarked gas tank that prompted relocation of a planned drilling location.

Materials Engineering Intern

Terracon · Internship

St. Louis, Missouri

  • Performed construction materials testing across approximately 30 sites: 50 fresh-concrete tests, 20 compressive-strength tests, 15 Atterberg limits, 10 nuclear-density tests, and two Proctor tests.
  • Identified and escalated approximately four out-of-specification results while maintaining ASTM procedures, field documentation, and quality standards.
  • Supported electrical-resistivity and seismic data collection through survey setup, equipment checks, calibration records, and site documentation.